Ongoing Project

Lagos-Calabar Coastal Highway Project

Phase I, Section I | Ahmadu Bello Way / Eko Atlantic to Eleko

The Lagos-Calabar Coastal Highway is a major federal corridor planned to run for roughly 700 kilometers along Nigeria's coastline. For the Lagos portion identified by the Federal Ministry of Works as Section I, the corridor covers 103 kilometers and is split into Phase I, Section I at 47.47 kilometers and Phase I, Section II at 55.6 kilometers.

The first active package highlighted here is being delivered by Hitech Construction Company Ltd. under an Engineering, Procurement, Construction and Financing arrangement. In an official ministry update published on December 13, 2025, 30 kilometers had already been temporarily opened to traffic, with the full 47.474-kilometer stretch targeted before the end of Q2 2026.

47.47km

Verified Phase I, Section I package now being delivered between Ahmadu Bello Way and Eleko.

10 Lanes

Official ministry description for the rigid-pavement highway, with a 20-meter rail reserve in the median.

30km

Temporarily opened to traffic on December 12, 2025, ahead of full Phase I, Section I completion.

Aerial view of the Lagos-Calabar Coastal Highway running beside the Lagos coastline
Paving equipment operating along the Lagos-Calabar Coastal Highway corridor in Lagos
Bridge deck works on the Lagos-Calabar Coastal Highway Section 2 corridor
Long aerial view of the Lagos-Calabar Coastal Highway following the Lagos shoreline
Active concrete pavement placement on the Lagos-Calabar Coastal Highway
Section 2 bridge works along the Lagos-Calabar Coastal Highway
Section 3B Calabar concrete corridor progressing through forest terrain
Section 3A Akwa Ibom concrete paving operation
Section 3B Calabar earthworks and red soil cutting

Verified Overview

A major coastal corridor with verified federal milestones and Hitech-led delivery

Official ministry information published on March 25, 2025 describes Section I in Lagos as a 103-kilometer corridor split into two packages, while the Non-Technical Summary for the ESIA identifies the current Phase I, Section I package as a 47.47-kilometer route from Ahmadu Bello Way in Eko Atlantic to Eleko.

The supplementary ESIA identifies Hitech Construction Company Ltd. as the project proponent and contractor. The same document says the supplementary study was prepared in February 2025 to align the project with IFC Performance Standards, World Bank Group EHS Guidelines, the African Development Bank's Integrated Safeguards System, and Equator Principles IV.

The ESIA Non-Technical Summary also indicates that peak construction manpower is expected to reach about 1,000 workers, supported by project yards, sand-borrow areas, monthly environmental and social monitoring, internal audits, and a formal grievance mechanism.

Section Archive

Tracking the coastal corridor by delivery section

The project archive now separates the Lagos delivery views from the emerging Section 3 records so the corridor can be followed more accurately as verified imagery is added.

Section 1 and 2 Lagos aerial view of the Lagos-Calabar Coastal Highway beside the coast

Sec 1 and 2 / Lagos

Coastal Lagos corridor works

Wide aerials and paving views show the Lagos-side corridor formation, rigid pavement works, and coastal alignment character.

Section 2 Lagos bridge deck and beam works on the Lagos-Calabar Coastal Highway

Sec 2 / Lagos Bridges

Bridge and deck construction

Bridge beams, deck preparation, and structure works make this section visibly different from the open-road carriageway images.

Section 3A Akwa Ibom concrete corridor through green terrain

Sec 3A / Akwa Ibom

Forest corridor progression

The Akwa Ibom record introduces red earthworks, forest-edge alignment, and concrete paving beyond the Lagos section.

Section 3B Calabar long concrete highway corridor through forest terrain

Sec 3B / Calabar

Calabar section works

Calabar imagery brings a clearer view of the later corridor stretch, from cut-and-fill earthworks to completed concrete lanes.

Verified Milestones

Key dates that help explain where the project stands

These milestones are based on official Federal Ministry of Works project updates and provide a clearer picture of the project's current status.

May 24, 2024

Phase I, Section I flagged off in Lagos

The Federal Ministry of Works formally flagged off the first active section of the project in Lagos.

March 25, 2025

Official technical scope clarified

The ministry described the Lagos Section I split, Hitech's role, and core design features such as the 10-lane configuration and rail reserve.

December 12-13, 2025

30km temporarily opened to traffic

The ministry said 30 kilometers had been completed and temporarily opened, while the Minister inspected the works and inaugurated the bridge at km 8.

Target: Q2 2026

Full 47.474km stretch expected

In the December 13, 2025 ministry update, Hitech Managing Director Dany Abboud said the full Phase I, Section I stretch was expected before the end of Q2 2026.

Delivery Features

What the official project information says about the corridor and its construction systems

Federal Ministry of Works project information describes Phase I, Section I as a rigid-pavement coastal highway with five lanes in each direction, a 20-meter reserve for a planned rail line, solar street lighting, CCTV coverage, and major drainage and bridge infrastructure.

  • 10-lane corridor with five carriageways in each direction.
  • 20-meter-wide median reserve intended for a future rail line.
  • Solar streetlights and CCTV infrastructure identified in official ministry updates.
  • Seven bridges and fifty-one culverts forming part of the delivery package.
  • Monthly environmental and social monitoring, internal audits, and formal grievance arrangements described in the ESIA summary.
Concrete paving equipment placing reinforced pavement on a Hitech highway project
Road-layer processing equipment operating on the Lagos-Calabar Coastal Highway